The mansion is getting some face-lifts.
Phase I
The ballroom floor:
Phase II
Repointing the mansion
and Improving the
drainage on the right side.
Phase III
Replacing the windows
and shutters:
The mansion will be going thru some upgrades and will no longer be available for rentals. The first floor will become mostly office space. The chapel is closed for renovations.
Repointing the mansion
&
Improving Drainage around the Right Side of the Mansion
Repointing around the outside of the mansion:






Removing the old steps to lay new drainage pipes:







The stone is put down and then the new steps are built:




