The mansion is getting some face-lifts.
Phase I
The ballroom floor:
Phase II
Repointing the mansion
and Improving the
drainage on the right side.
Phase III
Replacing the windows
and shutters:
The mansion will be going thru some upgrades and will no longer be available for rentals. The first floor will become mostly office space. The chapel is closed for renovations.
The Ballroom Floor Restoration
The floor with the old tiles:


All the tiles removed:


Sanding and buffing the original soft pine floor underneath the tile:




The floor with rugs:


The guys responsible for the renovated floor:


Luke R. McLaren, Brian S. Reynolds, and Chris Kolarek